After briefly pressing the ON/START key, specified test voltage
UN is read out and insulation resistance RISO is measured. As
soon as the measured value is stable (settling time may be
several seconds in the case of high cable capacitance values),
measurement is ended and the last measured values for RISO
and UISO are displayed. U is the voltage which is measured at
the test probes during and after testing. This voltage drops to a
value of less than 10 V after measurement (see section enti-
tled “Discharging the Device Under Test”).
or
As long as you press and hold the ON/START key, test voltage
UN is applied and insulation resistance R
ISO
is measured. Do
not release the key until the measured value has settled in
(settling time may be several seconds in the case of high cable
capacitance values). Voltage U, which is measured during
testing, corresponds to voltage UISO. After releasing the ON/
START key, measurement is ended and the last measured
values for R
ISO
and U
ISO
are displayed. U drops to a value of
less than 10 V after measurement (see section entitled “Dis-
charging the Device Under Test”).
q Pole Selection Report Entry
The poles between which testing takes place can only be entered
here for reporting purposes. The entry itself has no influence on
the actual polarity of the test probes or pole selection.
q Limits – Setting the Limit Value
The limit value for insulation resistance can be set as desired. If
measurement values occur which are below this limit value, the
red U
L
/R
L
LED lights up. A selection of limit values ranging from
0.5 to 10 M is available. The limit value is displayed above the
measured value.
Start Measurement – Rising Test Voltage (ramp function)
Press briefly:
Quick polarity reversal if parameter is set to AUTO: 01/10 ... 10/10: L1-PE
... L1-L3
Note
If “semiautomatic polarity reversal” is selected (see sec-
tion 5.8), the corresponding icon is displayed instead of
the ramp.
General Notes Regarding Insulation Measurements with Ramp
Function
Insulation measurement with ramp function serves the following
purposes:
Detect weak points in the test object’s insulation
Determine tripping voltage of voltage limiting components and
test them for correct functioning These components may
include, for example, varistors, overvoltage limiters (e.g.
DEHNguard® from Dehn+Söhne) and spark gaps.
The test instrument uses continuously rising test voltage for this
measuring function, up to the maximum selected voltage limit.
The measuring procedure is started by pressing the START/
STOPP key and runs automatically until one of the following
events occurs:
The selected voltage limit is reached
The selected current limit is reached
Sparkover occurs (spark gaps)
Differentiation is made amongst the following three procedures for
insulation measurement with ramp function:
Testing of overvoltage limiters or varistors
and determining their tripping voltage:
Select maximum voltage such that the anticipated breakdown
voltage of the device under test is roughly one third of this
value (observe manufacturer’s data sheet if applicable).
Select current limit value in accordance with actual require-
ments or the manufacturer’s data sheet (characteristic curve
of the device under test).
Determining tripping voltage for spark gaps:
Select maximum voltage such that the anticipated breakdown
voltage of the device under test is roughly one third of this
value (observe manufacturer’s data sheet if applicable).
Select the current limit value in accordance with actual
requirements within a range of 5 to 10 A (response charac-
teristics are too unstable with larger current limit values, which
may result in faulty measurement results).
Detecting weak points in the insulation:
Select maximum voltage such that it does not exceed the test
object’s permissible insulation voltage; it can be assumed that
an insulation fault will occur even with a significantly lower
voltage if an accordingly lower maximum voltage value is
selected (nevertheless at least greater than anticipated break-
down voltage) – the ramp is less steep as a result (increased
measuring accuracy).
Select the limit current value in accordance with actual
requirements within a range of 5 to 10 A (see also settings
for spark gaps).
Start Measurement – Constant Test Voltage
Long-term measurements
Press and hold:
Quick polarity reversal if parameter is set to AUTO: 01/10 ... 10/10:
L1-PE ... L1-L3
Note
The instrument’s batteries are rapidly depleted during the
insulation resistance measurement. When using the
constant test voltage” function, only press and hold the
Start t key until the display has become stable (if long-
term measurement is required).
45

Hulp nodig? Stel uw vraag in het forum

Spelregels
1

Forum

Gossen-Metrawatt-PROFITEST--MXTRA

Zoeken resetten

Misbruik melden

Gebruikershandleiding.com neemt misbruik van zijn services uitermate serieus. U kunt hieronder aangeven waarom deze vraag ongepast is. Wij controleren de vraag en zonodig wordt deze verwijderd.

Product:

Bijvoorbeeld antisemitische inhoud, racistische inhoud, of materiaal dat gewelddadige fysieke handelingen tot gevolg kan hebben.

Bijvoorbeeld een creditcardnummer, een persoonlijk identificatienummer, of een geheim adres. E-mailadressen en volledige namen worden niet als privégegevens beschouwd.

Spelregels forum

Om tot zinvolle vragen te komen hanteren wij de volgende spelregels:

Belangrijk! Als er een antwoord wordt gegeven op uw vraag, dan is het voor de gever van het antwoord nuttig om te weten als u er wel (of niet) mee geholpen bent! Wij vragen u dus ook te reageren op een antwoord.

Belangrijk! Antwoorden worden ook per e-mail naar abonnees gestuurd. Laat uw emailadres achter op deze site, zodat u op de hoogte blijft. U krijgt dan ook andere vragen en antwoorden te zien.

Abonneren

Abonneer u voor het ontvangen van emails voor uw Gossen Metrawatt PROFITEST MXTRA bij:


U ontvangt een email met instructies om u voor één of beide opties in te schrijven.


Ontvang uw handleiding per email

Vul uw emailadres in en ontvang de handleiding van Gossen Metrawatt PROFITEST MXTRA in de taal/talen: Engels als bijlage per email.

De handleiding is 2,28 mb groot.

 

U ontvangt de handleiding per email binnen enkele minuten. Als u geen email heeft ontvangen, dan heeft u waarschijnlijk een verkeerd emailadres ingevuld of is uw mailbox te vol. Daarnaast kan het zijn dat uw internetprovider een maximum heeft aan de grootte per email. Omdat hier een handleiding wordt meegestuurd, kan het voorkomen dat de email groter is dan toegestaan bij uw provider.

Stel vragen via chat aan uw handleiding

Stel uw vraag over deze PDF

loading

Andere handleiding(en) van Gossen Metrawatt PROFITEST MXTRA

Gossen Metrawatt PROFITEST MXTRA Gebruiksaanwijzing - Nederlands - 92 pagina's


Uw handleiding is per email verstuurd. Controleer uw email

Als u niet binnen een kwartier uw email met handleiding ontvangen heeft, kan het zijn dat u een verkeerd emailadres heeft ingevuld of dat uw emailprovider een maximum grootte per email heeft ingesteld die kleiner is dan de grootte van de handleiding.

Er is een email naar u verstuurd om uw inschrijving definitief te maken.

Controleer uw email en volg de aanwijzingen op om uw inschrijving definitief te maken

U heeft geen emailadres opgegeven

Als u de handleiding per email wilt ontvangen, vul dan een geldig emailadres in.

Uw vraag is op deze pagina toegevoegd

Wilt u een email ontvangen bij een antwoord en/of nieuwe vragen? Vul dan hier uw emailadres in.



Info